Land phases
The municipality recorded 232 plots in its 2021 entry for Jubail Island 1. It described 19 villas in the separate Island 2 entry.
Abu Dhabi City Municipality, 2021

Jubail land and access
On Jubail, check both the land phase and the road you can use to reach it. The municipality documented phase 1 plots, and a separate bridge project is planned.
On the island
The island plan, the registered phase and the road announcement each describe a different piece of the site.
The municipality recorded 232 plots in its 2021 entry for Jubail Island 1. It described 19 villas in the separate Island 2 entry.
Abu Dhabi City Municipality, 2021
Jubail’s mangrove setting shapes the questions to ask about the edge of a parcel and any access to the water.
ADREC market report
DMT announced a link between the islands and Sheikh Khalifa bin Zayed Highway, with 7 bridges and 3 tunnels in the wider project.
DMT, 27 October 2026
Jubail plot offers
Review the individual plot description and ask which route the seller uses for site visits.
There is no matching Jubail land card on this list. If you know the plot or phase, include it in your request.
Present and planned access
Trace the current approach to the parcel separately from the announced works for the islands.
| How will you reach the plot? | Parcel access today | Planned highway link |
|---|---|---|
| What to locate | The entrance marked on the parcel documents | The planned connection serving Ramhan and Jubail |
| Timing evidence | A visit using the roads open on the day | DMT’s October 2026 project announcement |
| Buying decision | Can your household or contractor reach the site now? | What would a future connection change for your journey? |
Drive to the actual plot before assigning a value to the future highway link. The announced opening is a target for the network.
Land and roads
The 2021 municipal project book and the October 2026 roads announcement answer different questions about a parcel.
Find an answer
Choose the part of the purchase that you need to investigate.
Choose your next check
Next step
The municipal project book has separate entries for Jubail Island 1 and 2.
Read the project bookPlan the visit
Give the seller the phase and parcel number before setting a time to meet.
Ask for directions using the current public approach and confirm any arrangement for site access.
Use the land plan to identify the roadside and waterside boundaries where applicable.
Confirm where vehicles could enter for an approved build and what permissions may be needed.
Site-specific costs
The parcel, the route for deliveries and the proposed house each affect the quotation you need.
| Cost | Amount | Notes |
|---|---|---|
| Purchase | Seller’s land offer | Confirm the boundaries and items included. |
| Site survey | Surveyor’s quote | Request a scope tied to the plot number. |
| Delivery and works | Site-based estimate | Ask the contractor to assess the access available now. |
A quote prepared for one Jubail site may assume a different approach road. Give the contractor the marked parcel plan when requesting costs.
Keep any assumptions about a future road in writing.
Funding a plot
Test the funding amount for the parcel first, then consider construction expenses on their own timetable.
Estimated monthly paymentAED 9,480
A sample price is provided for modelling. Use a written land finance quote to set the rate and term. Fees and construction are outside the estimate.
Jubail references
Open the island overview and the transport or land source relevant to your parcel.
Jubail plot questions
Check the phase, access and timing that apply to the particular landholding.
Yes. Its September 2021 publication describes 232 plots under Jubail Island 1 and includes a master plan for the development.
It records the scope of a past phase. For a current purchase, ask for a specific parcel offered by an owner.
ADREC’s named filters include Jubail Island Phase 1 under plots. Follow the project reference before comparing transactions.
DMT announced a project with 7 bridges connecting Ramhan and Jubail to Sheikh Khalifa bin Zayed Highway.
The announcement of 27 October 2026 gives a target of the second quarter of 2027. Confirm updates before relying on it for a journey.
The announcement covers the island transport network. The permitted approach to an individual plot still needs to be checked on its documents.
Identify the relevant boundary on the parcel plan and inspect the view from the site. Obtain evidence of any private water access claimed.
The road announcement describes a network. Travel time for your offer depends on the starting point, the parcel entrance and the roads open on the day.
Ask the contractor to confirm a delivery route using current access. Any programme that assumes a future opening should identify that assumption.
A phase reference, parcel plan and marked access point let the adviser and seller discuss the same site.
Jubail land and access
Share the phase, parcel size and access you require for a viewing or future build.